A machine’s OEE improves from 75% to 90%. Availability is up, downtime is down and the dashboard shows a significant improvement. Yet the production line still delivers exactly the same number of good parts per shift.

How is that possible? And more importantly, what did the company actually gain from the improvement?

OEE (Overall Equipment Effectiveness) is one of the most frequently requested KPIs in industrial digitalisation projects. And for good reason: it combines availability, performance and quality into a single indicator that helps identify production losses.

However, improving an individual machine’s OEE does not necessarily improve the output of the entire production process. Whether it does depends on the machine’s role in the production flow, the actual constraints and the impact of the improvement on the wider operation.

That distinction matters, particularly when OEE is used to justify investments, prioritise improvement measures or evaluate the success of a digitalisation project.

By Martin Waßmann – IT/OT Experts

What OEE Actually Measures – and What It Doesn’t

OEE combines three factors: Availability, Performance and Quality. It measures how effectively equipment uses its planned production time compared with an ideal production scenario.

  • Availability: How much of the planned production time was the equipment actually running?
  • Performance: How much was produced compared with the theoretical output at the defined ideal cycle time?
  • Quality: What proportion of the produced units met the quality requirements?

OEE = Availability × Performance × Quality

All three factors are important. An OEE of 70% may result from frequent breakdowns, reduced speed, quality losses or a combination of these. Looking only at the final percentage does not explain where the losses originate.

The underlying definitions also matter. Planned production time, ideal cycle time, product mix, changeovers and the classification of machine states must be consistent before different OEE values can be meaningfully compared. The ISO 22400-2 standard provides definitions for manufacturing operations KPIs, including OEE.

But even a perfectly calculated OEE has a limitation: it describes the effectiveness of the equipment within the defined measurement boundary. It does not automatically tell us whether improving that equipment will increase total production output, reduce overall costs or improve the profitability of the manufacturing process.

Machine effectiveness and production system performance are related, but they are not the same thing.

A Practical Example: Three Machines, One Bottleneck

Consider a production line consisting of three consecutive machines. For simplicity, assume a stable product mix, sufficient intermediate buffers, constant demand and no quality or speed losses beyond the availability losses explicitly stated below.

  • Machine A – Feeding: Nominal capacity of 120 units per hour. At 75% availability, its average effective capacity is 90 units per planned production hour.
  • Machine B – Processing: Effective capacity of 80 good units per hour.
  • Machine C – Packaging: Effective capacity of 110 good units per hour.

Under these simplified conditions, the production line is limited by Machine B. Even though Machines A and C could process more units, the overall throughput cannot exceed 80 good units per hour.

Now imagine that Machine A receives a technical improvement. Its availability increases from 75% to 90%, raising its average effective capacity from 90 to 108 units per hour. If its performance and quality factors remain at 100%, its OEE increases accordingly.

The improvement looks impressive in the machine dashboard. But Machine B still processes only 80 good units per hour.

Before the improvement: 80 good units per hour.
After the improvement: 80 good units per hour.

The additional capacity of Machine A cannot increase the line’s output because the constraint remains unchanged. If the upstream machine continues producing without appropriate flow control, the additional output may simply create more work in progress until the buffer fills up.

Real production systems are more complex. Buffer capacities, failure patterns, material flow and the timing of machine interruptions can all influence actual throughput. Improving a non-bottleneck machine can therefore still improve the line’s performance, particularly if it previously caused starvation at the constraint.

Nevertheless, the example illustrates an important point: a local improvement only creates additional line throughput when it removes or reduces a constraint affecting the overall process.

The Lowest OEE Is Not Necessarily the Bottleneck

One of the mistakes I see in performance improvement discussions is treating the machine with the lowest OEE as the obvious starting point for optimisation.

That may be the right decision, but it is not necessarily the best one.

A machine with an OEE of 65% might still have sufficient capacity to supply the next production step. Meanwhile, another machine with an OEE of 85% may be running close to its capacity limit and restricting the output of the entire line.

Improving the first machine might make its individual KPI look better without generating any additional finished products. Reducing losses at the actual bottleneck, however, can directly increase the line’s available output, provided sufficient material, downstream capacity and demand exist.

This is closely related to the Theory of Constraints, which focuses improvement efforts on the constraints limiting the performance of the overall system.

In practice, identifying the bottleneck is not always as simple as comparing nominal machine speeds. Production constraints can shift depending on product mix, operating conditions, maintenance activities or the availability of operators and materials.

It is therefore useful to look at more than individual OEE values:

  • Blocked states: Is a machine unable to release its output because the downstream process cannot accept more material?
  • Starved states: Is a machine waiting because the upstream process is not supplying enough material?
  • Buffer behaviour: Where does work in progress accumulate, and where do buffers repeatedly run empty?
  • Effective throughput: How many good units actually leave the production process within the relevant period?
  • Loss dependencies: Which machine interruptions affect the entire line, and which remain local?

The distinction between internal machine losses and externally caused interruptions is particularly important. A machine may stop because of its own fault, but it may also be forced to stop because another part of the process is unavailable.

Simply comparing machine OEE percentages will not reveal all these relationships. And calculating an average OEE across several machines is not a substitute for analysing the performance of the complete production line.

When Improving a Non-Bottleneck Still Makes Sense

Does that mean improving a machine that is not the bottleneck is pointless? Of course not. But we need to understand what the improvement actually achieves.

Consider an upstream machine with sufficient average capacity to supply the bottleneck. If that machine experiences frequent short interruptions, the downstream process may still run out of material, particularly when intermediate buffers are small. Improving its reliability could therefore increase overall throughput, even though its nominal or average capacity was already higher than that of the bottleneck.

There are also improvements that create value without increasing production output. Reducing unplanned maintenance, avoiding scrap, improving energy efficiency or reducing the need for operator intervention can all have measurable economic benefits.

The distinction is important because additional production capacity is only one possible outcome of an improvement measure. Lower operating costs, improved process stability or greater delivery reliability can be equally relevant.

What I would challenge, however, is an investment justified primarily by a higher machine OEE without demonstrating how that improvement affects the wider production process.

If the objective is to increase line throughput, we need to understand whether the measure actually supports that objective. If the objective is to reduce maintenance costs, we should evaluate those savings instead. Simply reporting a better OEE percentage does not answer either question.

From OEE Improvement to Economic Value

Let’s return to the three-machine example. Machine B is currently limiting the line to 80 good units per hour, while Machines A and C have sufficient capacity to support a higher output.

Now assume we can improve Machine B’s effective throughput from 80 to 88 good units per hour. Under stable operating conditions, and provided the other machines can sustain the required material flow, the line could produce eight additional good units per hour.

With 16 planned production hours per day and 220 production days per year, this represents a theoretical additional capacity of:

8 units/hour × 16 hours/day × 220 days = 28,160 additional good units per year.

That gives us something more useful than an isolated OEE improvement: a quantifiable potential increase in finished production.

But even this is not yet a business case. Can the additional units actually be sold? Does the company need the extra capacity, or would it simply create additional inventory? What contribution margin would the extra production generate, and which additional costs would arise?

If we assume an incremental contribution margin of €4 per additional good unit, the theoretical annual contribution would be €112,640. This is an illustrative calculation, not a customer result or a guaranteed saving. Actual benefits depend on realised output, demand, operating conditions and the costs of the improvement.

We also need to consider the investment itself, implementation effort, potential production interruptions, maintenance requirements and ongoing operating costs.

Sometimes improving a bottleneck is economically attractive. In other cases, the required investment may be disproportionate to the additional output, or the available demand may not justify increasing capacity at all.

The relevant question is therefore not simply how much OEE can be improved, but what measurable financial and operational benefit the improvement creates.

Which Production Data Do We Actually Need?

Identifying the actual production constraint requires more than collecting OEE values from individual machines. We need to understand how the equipment interacts and which losses affect the overall production flow.

Depending on the production process, I would typically look at the following information:

  • Machine states and timestamps: When was each machine producing, stopped, blocked, starved or unavailable? How are those states defined and recorded?
  • Production quantities: How many units entered and left each process step, and how many of them were good parts or rejects?
  • Actual and nominal cycle times: How does the real production speed compare with the expected performance under the current operating conditions?
  • Material flow and buffer levels: Where does material accumulate, where do buffers run empty and how do these conditions affect neighbouring machines?
  • Production context: Which product, order, recipe or operating mode was active when the data was recorded?
  • Downtime reasons and dependencies: Was an interruption caused by the machine itself, an upstream or downstream process, missing material or an external event?

Not every production line requires all these data points, and not every machine provides them directly. Some information may already exist in PLCs, MES applications or historians, while other data needs to be derived, combined or collected separately.

What matters is that the information is reliable, sufficiently granular and comparable across the relevant process steps. Timestamps need to be aligned, machine states must have consistent definitions and production quantities have to refer to the correct measurement periods.

Otherwise, even technically correct calculations can lead to misleading conclusions. For example, a machine classified as stopped because its downstream buffer is full should not automatically be treated as having an internal equipment failure.

This is where industrial data integration and semantic modelling become useful. Not because every production line needs a new data platform, but because the relationships between machines, states, material flow and production context must be understood before meaningful conclusions can be drawn.

Often, the first step is simply to evaluate what information already exists and whether it is sufficient to answer the operational question. Additional sensors, interfaces or software should be considered where they provide the missing information and justify their cost.

Why Comparing OEE Across Plants Can Be Misleading

Another challenge arises when OEE is used to compare machines, production lines or entire manufacturing sites. A management dashboard might show Plant A with an average OEE of 78% and Plant B with 85%. Does that automatically mean Plant B is performing better?

Not necessarily. Different production processes, product mixes, equipment capacities and operating conditions can have a significant influence on the results. Even the definition of planned production time or the classification of downtime may differ between sites.

Consider two plants producing similar products. One operates highly automated, high-volume lines with long production runs. The other manufactures smaller batches with frequent product changes. Comparing their OEE values without accounting for these differences may lead to incorrect conclusions about their operational performance.

The same applies to the measurement boundary. A machine-level OEE, a properly defined line-level OEE and an average calculated from several individual machine values are not interchangeable.

Before comparing performance across sites, I would therefore establish common definitions, calculation methods and measurement boundaries. This includes planned production time, ideal cycle times, quality criteria, machine states and the treatment of planned and unplanned interruptions.

Even with standardised definitions, the results still need to be interpreted in the context of the actual production processes.

Standardising a KPI makes the calculation comparable. It does not automatically make the underlying production conditions comparable.

Better OEE Is Not the Objective

OEE is a useful indicator for understanding equipment losses and identifying opportunities for improvement. I would certainly not recommend abandoning it. But it should remain a tool for evaluating production performance rather than becoming the objective itself.

When a machine’s OEE improves, I want to understand what changed in the production process. Did the improvement increase the number of good units leaving the line? Did it reduce maintenance costs, scrap, energy consumption or operator effort? Or did we simply improve a local measurement without achieving a relevant benefit for the overall operation?

These questions become particularly important when improvement initiatives require significant investments in machinery, automation, software or data infrastructure.

For me, the starting point should always be the operational problem and its economic impact. From there, we can determine which information is required, which technical measures are appropriate and how the result should be evaluated.

A higher OEE is a measurable improvement in equipment effectiveness. Whether it represents a successful business investment depends on what the company actually gains from it.

For a related perspective on reliable production data and the responsibilities behind it, see our article on IT/OT Governance After Go-Live.

Frequently Asked Questions

Can OEE Increase Without Increasing Production Output?

Yes. Improving the OEE of an individual machine does not necessarily increase the output of the entire production line. If another process step remains the bottleneck, the additional machine capacity may not translate into more finished products. However, improvements can still create value through lower costs, higher reliability or reduced quality losses.

Does the Machine With the Lowest OEE Always Represent the Bottleneck?

No. A machine with a low OEE may still have sufficient capacity to support the overall production flow. Another machine with a higher OEE may operate closer to its capacity limit and restrict total throughput. Identifying the bottleneck requires analysing effective capacities, material flow, buffers and the relationships between production steps.

What Is the Difference Between Machine OEE and Line OEE?

Machine OEE measures the effectiveness of individual equipment within a defined measurement boundary. Line OEE evaluates the performance of an entire production line using an appropriate line-level definition. It should not be confused with a simple average of individual machine OEE values. The measurement boundary, planned production time, reference performance and output must be clearly defined.

Which Production Data Is Needed to Identify Bottlenecks?

Relevant information may include machine states, timestamps, production quantities, cycle times, buffer levels, blocked and starved conditions, downtime reasons and production context. The exact requirements depend on the process. Understanding how machines interact is usually more valuable than collecting isolated machine KPIs without additional context.

Is Improving OEE Always Economically Beneficial?

Not necessarily. An OEE improvement may increase throughput, reduce costs or improve reliability, but the benefit depends on the production process and the actual business requirements. Investment costs, additional operating expenses, available demand and the effect on the overall production system must be considered before determining whether an improvement is economically worthwhile.

Can OEE Values Be Compared Across Different Production Sites?

Yes, but only with appropriate definitions and context. Planned production time, ideal cycle times, quality criteria, downtime classifications and measurement boundaries need to be consistent. Even then, different products, production methods and operating conditions can limit how meaningful a direct comparison is.

Improve Production Performance, Not Just the KPI

Understanding the relationship between equipment effectiveness, production constraints and economic performance is an important starting point for meaningful improvement initiatives.

At IT/OT Experts, we support manufacturers in analysing production requirements, integrating industrial data and developing technical solutions that address actual operational problems. From evaluating existing systems and identifying relevant data to designing scalable IT/OT architectures and implementing solutions on the shop floor.

The objective is not to introduce another dashboard or improve an isolated KPI, but to create measurable improvements in production performance and business outcomes.

About the Author

Martin Waßmann is the founder of IT/OT Experts and supports manufacturing companies with digital strategy, IT/OT integration and scalable production data architectures.

His focus includes Brownfield integration, Unified Namespace, MQTT and OPC UA.
More about Martin Waßmann