Multi-Site Standardization: Standardize Information, Not Every System

KNOWLEDGE | Industrial Data

Three manufacturing plants, three different MES systems, multiple generations of PLCs and a mixture of SCADA platforms, historians and locally developed applications. Management wants consistent production KPIs across all sites, better transparency and the ability to scale digital solutions internationally.

The proposed solution often sounds straightforward: Standardise the technology. Introduce the same software, connect the same interfaces and establish one common platform for every plant.

But replacing functioning systems across multiple sites can quickly become a costly transformation programme. Different plants have different production processes, equipment generations, contractual obligations and operational requirements. And even after standardising the software, the same KPI can still mean something entirely different at each location.

The real challenge is not making every factory use the same systems. It is making the information from those systems consistent, understandable and reusable.

This distinction matters when manufacturers want to consolidate production reporting, deploy analytics across multiple sites or establish scalable IT/OT architectures. Standardisation can create significant value, but only if we standardise the right things.

By Martin Waßmann – IT/OT Experts

The Expensive Mistake: Standardising Technology Before Information

Imagine a manufacturing group operating five production sites. One plant uses a modern MES, another relies on a combination of SCADA and historian applications, while a third has developed specialised software around its production process.

All three approaches may have valid reasons to exist. The plants may manufacture different products, use different technologies or have invested in systems that reliably support their operational requirements.

Introducing a single MES or SCADA product across the entire organisation might simplify certain aspects of maintenance, vendor management and application support. But it also involves migration costs, production risks, process changes, retraining and potentially the replacement of functionality that already works well.

More importantly, installing the same application does not automatically produce consistent information.

Consider a simple KPI such as production availability. At one site, planned maintenance is excluded from the calculation. At another, all downtime during a scheduled shift is included. A third site distinguishes between technical availability and operational availability.

All three sites might report an availability of 85%. Yet those numbers describe different conditions and cannot be compared meaningfully.

Replacing their applications with the same product would not resolve that problem unless the underlying definitions were harmonised as well.

Technology standardisation can reduce complexity. Information standardisation is what makes cross-site analysis meaningful.

There are certainly situations where consolidating systems makes economic and operational sense. The point is not to reject common platforms, but to avoid treating them as a prerequisite for comparable production data.

What Should Actually Be Standardised?

For multi-site manufacturing data standardisation, I would start by defining the information that needs to be understood consistently across the organisation, rather than prescribing how each plant must generate or store it.

In practice, several elements are particularly important:

  • Business definitions: What exactly do we mean by availability, downtime, good production, scrap, energy consumption or production output? Which calculation rules and measurement boundaries apply?
  • Asset and process context: Which site, production area, line, process step or equipment does the information belong to? How are assets identified, and how do their relationships change over time?
  • Semantic definitions: What does a value represent? Is it an instantaneous measurement, a cumulative counter, a calculated KPI or a reported event? Which unit, reference and quality requirements apply?
  • State and event models: What constitutes a machine running, producing, blocked, starved or unavailable? Which transitions and event timestamps are relevant?
  • Data quality and lifecycle: How do consumers recognise missing, stale or invalid information? Who maintains definitions, approves changes and handles version compatibility?
  • Information interfaces: How should agreed information be exposed to other systems? Which schemas, identifiers, metadata and access rules must integrations follow?

None of these decisions requires every plant to use the same PLC manufacturer, MES application or database.

A plant can continue using its existing operational systems while providing agreed information through a common integration and semantic layer. Another plant may use entirely different source technologies but publish information that follows the same definitions.

However, standardisation does not mean forcing every process into an oversimplified universal data structure. A packaging line, a chemical reactor and a machining cell have different operational characteristics. Their models should share common concepts where appropriate while retaining the domain-specific information required to describe their processes accurately.

The goal is consistent meaning and clearly defined interfaces, not artificial uniformity.

A Practical Example: The Same KPI, Three Different Sources

Consider three production plants that need to report the number of good units produced during each shift.

At first glance, this seems like one of the easiest KPIs to standardise. Each plant already has some form of production counter. Why not simply collect the values and display them in a group-wide dashboard?

The problem becomes apparent when we inspect the source data:

  • Plant A: The PLC exposes a cumulative counter of accepted parts. The counter resets when the controller restarts, but it has no direct relationship to shift boundaries.
  • Plant B: The MES provides completed quantities per production order. Those quantities are validated after production and may be updated retrospectively.
  • Plant C: The packaging machine counts completed cartons. Depending on the product, each carton contains a different number of individual units.

All three plants could publish a value called goodCount. But using the same name would not make the values comparable.

Plant A needs counter resets and shift boundaries to be handled correctly. Plant B requires a clear rule for assigning completed and potentially corrected quantities to reporting periods. Plant C needs a conversion based on the actual packaging configuration.

Before creating a group-wide KPI, we therefore need a shared definition of what constitutes a good unit, when production is attributed to a shift, which production step is measured and how corrections are handled.

Once those rules are agreed, each plant can implement the required transformation locally or through an integration layer. The resulting information can follow a common structure, regardless of where it originated.

For example, a standardised production quantity record might contain:

  • A stable identifier for the site, production line and relevant process step.
  • The defined product or production-unit type being counted.
  • The reporting period and its start and end timestamps.
  • The number of accepted production units and the applicable unit of measure.
  • The source system, calculation or aggregation method and data-quality status.
  • A version or correction reference where previously reported quantities may change.

The reporting application no longer needs to understand every PLC counter, MES implementation or packaging configuration. It consumes information expressed according to an agreed contract.

That does not eliminate the work required to integrate each plant. Source-specific mapping, validation and exception handling remain necessary. But those differences can be handled without forcing every site to replace its existing operational systems.

Three different source systems can provide consistent information. Three identical systems can still produce inconsistent information if their definitions differ.

An Architecture That Separates Local Systems from Shared Information

If we accept that existing production systems do not need to be identical, the next question is how to make their information consistently available.

I would separate the architecture into four logical responsibilities. These are not necessarily four different software products or infrastructure layers. Depending on the environment, several responsibilities may be implemented within the same system.

1. Existing Operational Systems

Machines, PLCs, SCADA applications, MES solutions, historians and other operational systems remain responsible for their respective production functions.

There is no inherent reason to replace a functioning MES simply because another plant uses a different product. What matters is whether the required information can be accessed reliably, with sufficient context and without compromising production operations.

2. Source Integration and Transformation

This is where source-specific differences are handled. An integration component may read an OPC UA variable, process an MES event, query an existing database or interpret information from a legacy interface.

Its responsibility is not merely to forward values. Depending on the use case, it may also need to convert units, identify counter resets, associate measurements with production orders or translate local machine states into an agreed model.

These transformations should be transparent, testable and documented. Otherwise, the integration layer becomes a collection of hidden business rules that nobody can maintain.

3. Shared Information Contracts

At this level, the organisation defines how information should be represented independently of its source.

A production event, for example, could follow an agreed schema containing a stable equipment identifier, event type, timestamps, production context, quality information and a schema version.

The contract also needs a clear semantic definition. A field called quantity is not sufficient unless consumers know whether it describes produced parts, accepted units, packaged quantities or something else.

These information contracts can be exposed through messaging systems, APIs, databases or other suitable interfaces. The important requirement is that consumers can rely on their definitions and understand how changes are managed.

4. Applications and Business Use Cases

Reporting, analytics, energy management, predictive maintenance and other applications consume the agreed information without having to implement separate source-specific logic for every production site.

A group-wide reporting solution should not need to know which PLC manufacturer Plant A uses or how Plant B internally calculates an MES counter. Those differences belong behind the agreed information interface.

That does not mean every application must consume the same representation of every data point. Real-time monitoring, historical analysis and business reporting may require different access patterns or aggregations. What should remain consistent is the meaning of the information and its relationship to the underlying production process.

The objective is to isolate local technical differences while making shared information reusable across the organisation.

Standards Provide Building Blocks, Not a Complete Corporate Data Model

When defining shared manufacturing information, there is no reason to invent every concept from scratch. Existing standards provide useful structures, terminology and information models.

However, it is important to understand what each standard actually addresses and where company-specific decisions are still required.

ISA-95 / IEC 62264

ISA-95 / IEC 62264 provides models and concepts for enterprise-control system integration, including equipment, personnel, material, operations and their relationships.

It is a useful reference when different plants need a common understanding of manufacturing operations and their organisational context.

But applying ISA-95 does not mean that every piece of production information must be forced into a rigid site-area-line-machine topic hierarchy. Real manufacturing relationships can be more complex, and a single hierarchy cannot always express every functional, physical or operational relationship.

OPC UA and Companion Specifications

OPC UA offers more than a communication mechanism. Its information modelling capabilities allow equipment, properties, references and relationships to be represented in a structured way.

OPC UA Companion Specifications extend these capabilities with domain-specific models developed for particular equipment types, industries and use cases.

Where machines expose suitable standardised models, integration work can be reduced significantly. However, connecting to an OPC UA server does not automatically mean that its data follows a common semantic model. Many existing installations still expose vendor-specific structures and variable names.

MQTT and Sparkplug

MQTT is a lightweight messaging protocol. It provides an efficient way to distribute information, but does not define what a manufacturing KPI or machine state means.

Sparkplug adds conventions for topic namespaces, payloads, metrics and session-state management to MQTT-based infrastructures. This is particularly useful for consistent device integration and connection-state awareness.

However, Sparkplug does not define a universal business meaning for every metric. A value called GoodCount still requires an agreed definition of what is counted, under which conditions and at which point in the production process.

Asset Administration Shell

The Asset Administration Shell (AAS) provides a standardised approach to representing digital information about assets, including submodels, properties and semantic references.

It can be useful when manufacturers want interoperable asset descriptions, digital twin information or reusable submodels across vendors and sites.

But introducing an Asset Administration Shell does not automatically harmonise production KPIs or solve the integration of every legacy machine. The relevant submodels, mappings and operational requirements still need to be defined and implemented.

Standards should reduce unnecessary variation. They do not eliminate the need to agree on business meaning, responsibilities and the scope of standardisation.

A Unified Namespace Is Not Automatically a Unified Information Model

A Unified Namespace (UNS) can be an effective architectural approach for making industrial information available across systems and organisational boundaries.

Instead of building individual point-to-point integrations for every application, producers can make relevant information available through a shared communication and information architecture. Consumers can then access that information without requiring a separate connection to every underlying machine or system.

However, using MQTT and publishing information under a common topic structure does not automatically create semantic interoperability.

Imagine that three plants publish the following values:

  • site-a/line-01/production/goodCount
  • site-b/line-01/production/goodCount
  • site-c/line-01/production/goodCount

The topic names look consistent. But if the first value represents accepted individual parts, the second represents quantities confirmed by the MES and the third counts completed packaging units, the information is still not comparable.

The communication architecture has been standardised. The underlying meaning has not.

A properly designed UNS architecture should therefore address more than topic naming:

  • Semantic contracts: Agreed definitions for information types, units, states, events and calculations.
  • Stable identities: Identifiers that remain meaningful even when machines are moved, systems are replaced or organisational structures change.
  • Context and relationships: Information about equipment, production processes, locations and the relationships between them.
  • Data quality and lifecycle: Timestamps, validity, source information, schema versions and change management.
  • Decoupled integration: Source-specific systems should be able to change without forcing every downstream application to be rewritten.

It is also important not to confuse a topic hierarchy with a complete asset or process model. A machine may belong to a physical location, perform a particular function and participate in different production processes over time. These relationships are not always best represented by a single hierarchical path.

Depending on the requirements, a stable asset identifier and additional relationship metadata may be more useful than encoding every aspect of the asset into its MQTT topic.

A UNS can expose raw source information, standardised information or both, provided the distinction is explicit. Not every source value needs to be transformed into a corporate model before it can be useful. But applications that depend on comparable information need a reliable semantic contract.

A shared namespace makes information accessible. Shared semantics make it understandable and reusable.

For more technical background, see our articles on Unified Namespace architecture and MQTT, OPC UA and UNS integration.

Standardise Centrally, Implement Locally

One of the difficult questions in multi-site programmes is where standardisation should be enforced and who should be allowed to make local decisions.

In my view, the organisation should distinguish between information contracts that need to be consistent across sites and implementation decisions that can remain local.

A central team may define how production quantities, equipment identities, quality statuses and common machine events must be represented. But that does not necessarily mean the same team should decide which PLC interface, edge gateway or integration software every plant must use.

Local engineering teams understand the machines, processes and operating constraints at their sites. Central architecture and data governance teams understand the requirements for interoperability, reporting and reuse across the organisation.

Both perspectives are necessary.

What Should Be Governed Centrally?

  • Definitions of shared production information and KPIs.
  • Common identifiers, terminology and semantic references.
  • Information contracts, schemas and compatibility requirements.
  • Requirements for security, data quality and lifecycle management.
  • Rules for approving changes that affect multiple sites or consuming applications.

What Can Remain Site-Specific?

  • How existing PLCs, MES applications and historians are connected.
  • Which suitable integration technologies are used within agreed architectural boundaries.
  • How local production-specific information is collected and interpreted.
  • Which transformations are necessary to satisfy the shared information contracts.
  • How operational support is organised within the agreed service responsibilities.

This separation creates flexibility without abandoning standardisation.

For example, one plant may derive a standardised machine-state event directly from an OPC UA information model. Another may calculate the same agreed state from several legacy PLC signals. A third may obtain it from an existing MES.

All three approaches can be valid, provided the resulting state has the same agreed meaning, quality requirements and lifecycle behaviour.

However, local freedom should not turn into uncontrolled variation. Source mappings must be validated, deviations documented and changes reviewed when they affect shared definitions. Otherwise, the organisation gradually rebuilds the same inconsistencies that the standardisation programme was intended to remove.

Central governance should define what information means and how it can be used. Local implementation should determine how that information is obtained safely and efficiently.

The Second Plant Is the Real Test of Standardization

A successful pilot at one manufacturing site does not automatically prove that an architecture can be scaled across an entire organisation.

Within a single plant, the integration team can often work around inconsistent naming conventions, undocumented production logic and local system limitations. The result may function perfectly well, but much of the implementation knowledge remains specific to that location.

The real test begins when a second plant needs to provide the same information.

Does the existing information contract still apply? Can the second plant use the agreed definitions without changing its production processes? Which integration components can be reused, and which mappings need to be implemented locally?

If every new site requires a complete redesign of the data model, KPI definitions and consuming applications, the organisation has not achieved meaningful standardisation. It has simply created several individually engineered solutions.

I would therefore approach a multi-site rollout in stages:

  1. Define a limited set of shared use cases. Start with information that has a clear cross-site purpose, such as production quantities, equipment states or energy consumption. Avoid trying to standardise every available machine signal.
  2. Establish the information contracts. Agree on definitions, identifiers, units, timestamps, quality requirements and responsibilities before implementing the next integration.
  3. Validate the model at a second, deliberately different site. Choose a plant with a different system landscape or production environment. This reveals which assumptions were specific to the first implementation.
  4. Separate reusable components from local mappings. Common schemas, validation rules and consumer interfaces should be reusable. Source connectivity and process-specific transformations may remain local.
  5. Document exceptions and evolve the model. Not every difference is a defect. Some requirements are genuinely site-specific and should be represented explicitly instead of being hidden behind misleading common definitions.
  6. Measure the effort required for each additional rollout. Track implementation time, integration costs, changes to existing applications and ongoing support requirements.

Only after the common model has proven itself across different operational environments would I expand the rollout more broadly.

A scalable architecture should make the next site easier to integrate, not require another complete integration project.

The Economics of Multi-Site Standardization

Standardisation is often justified by the expectation that integration becomes cheaper as more sites are connected. That can be true, but it is not an automatic consequence of introducing a common platform or messaging infrastructure.

There is an initial investment in defining shared information, developing integration patterns, validating source mappings and establishing the necessary governance.

These activities create value when they reduce the work required for subsequent implementations or enable applications to be reused across multiple plants.

Consider a group-wide production reporting solution. Without shared information contracts, each plant may require custom data preparation, individual KPI calculations and separate adjustments to the reporting application.

With a properly defined information model, each site still needs to integrate its existing systems. However, the reporting application can consume the same agreed information structure, and common validation and calculation logic may be reused.

The economic benefit can arise from several areas:

  • Lower integration effort: Reusable schemas, mapping patterns and integration components reduce repetitive engineering work.
  • Reduced application maintenance: Changes to individual source systems do not necessarily require modifications to every consuming application.
  • Faster deployment of new use cases: Applications can consume existing standardised information rather than starting each project with another round of source-system integration.
  • Avoided system replacement: Functioning local applications can remain in operation where replacement would provide insufficient additional value.
  • Improved reporting quality: Consistent definitions reduce manual reconciliation and the effort required to explain differences between sites.

But there are costs on the other side of the equation. Shared information models need maintenance, changes require coordination and integration components must be operated securely and reliably. Local source systems do not disappear, nor does the need for people who understand them.

For an economic assessment, I would compare the total cost of alternative approaches over a realistic period: initial architecture and modelling work, site onboarding, application development, migration effort, support and lifecycle costs.

Two measures are particularly useful: the incremental cost of onboarding another plant and the additional effort required to deploy an existing use case at that plant.

If those costs remain almost unchanged with every rollout, the supposed standardisation deserves closer examination.

The objective is not to build the largest possible shared data architecture. It is to create enough standardisation to deliver repeatable business value at a lower total cost.

Who Owns the Common Information Model?

One of the most underestimated aspects of multi-site standardisation is what happens after the first information contracts have been implemented.

Machines are replaced, production processes change, new products are introduced and applications require additional information. The shared model must evolve accordingly.

Without clear ownership, two things tend to happen. Either sites start extending the model independently, creating incompatible variations, or central approval processes become so restrictive that local teams bypass them to get their work done.

Neither outcome supports long-term interoperability.

I would therefore establish a lightweight but explicit governance model that addresses several responsibilities:

  • Business and semantic ownership: Who defines what shared production information means and approves changes to common KPI definitions?
  • Technical model ownership: Who maintains schemas, identifiers, documentation, validation rules and published information contracts?
  • Local mapping responsibility: Who verifies that source-specific transformations correctly implement the agreed definitions at each plant?
  • Version and compatibility management: How are changes introduced without unexpectedly breaking existing applications?
  • Operational responsibility: Who monitors integration health, data freshness and failures across the participating systems?

For example, a new reporting requirement might lead to an additional optional attribute in a production event. Existing consumers could potentially continue operating unchanged.

Changing the meaning of an existing quantity field is fundamentally different. Even if the field name remains unchanged, the change may invalidate historical comparisons or cause applications to produce incorrect results.

This is why semantic compatibility matters just as much as technical schema compatibility. A payload can remain syntactically valid while its business meaning changes.

Where breaking changes are necessary, they should be versioned, documented and coordinated with affected consumers. Depending on the architecture, old and new representations may need to coexist during a transition.

Local extensions should also follow clear rules. A plant may need additional process-specific information without requiring every other site to adopt the same fields. The challenge is allowing that flexibility without compromising the common information contracts.

Standardisation is not finished when the data model is published. It needs ownership, validation and a controlled way to evolve.

For a broader discussion of operational responsibilities after implementation, see IT/OT Governance After Go-Live: Who Keeps Production Data Running?.

When Standardising Systems Still Makes Sense

None of this means manufacturers should avoid standardising their software and technology landscape.

There are legitimate reasons to consolidate applications, platforms and infrastructure across multiple sites. Common systems can simplify support, reduce licensing complexity, improve security management and enable the reuse of operational processes.

For example, replacing several ageing MES applications may make sense when maintenance costs are increasing, vendor support is ending or the existing solutions cannot meet future operational requirements.

Similarly, a shared integration platform can provide valuable economies of scale when plants have comparable technical requirements and the organisation has the capabilities to operate it reliably.

But these decisions should be based on their own business case.

If the objective is consistent production reporting, replacing every MES may be unnecessary. If the objective is to harmonise production execution processes across a group, a common MES solution might be part of the appropriate answer.

The same applies to infrastructure. A centralised architecture can simplify management and access to shared information, while local or hybrid deployments may be necessary for latency, availability, regulatory or operational reasons.

There is no universal architecture that fits every manufacturing organisation.

I would distinguish three decisions:

  1. What information must be standardised? This follows from the business use cases and the need for consistent meaning across sites.
  2. Which technical interfaces and platforms should be shared? This depends on integration requirements, security, lifecycle costs and the ability to operate the architecture.
  3. Which operational applications should be consolidated? This requires a separate evaluation of functionality, process harmonisation, migration risks and economic benefit.

These decisions influence each other, but they should not be treated as identical.

Standardise systems where it creates value. Standardise information wherever consistent understanding and reuse are required.

The Goal Is Reusable Information, Not Uniform Technology

Multi-site standardisation should not begin with the question of which software every factory needs to use. It should begin with the information the organisation needs to understand and reuse across its production network.

When manufacturing data is described consistently, existing systems can contribute to common reporting, analytics and operational applications without necessarily being replaced. Different plants can retain suitable local solutions while following shared definitions and information contracts.

But the work does not end with a common schema or MQTT topic structure. Source mappings need to be validated, business definitions maintained and changes coordinated. Standardisation only creates lasting value when the information remains consistent as machines, applications and production processes evolve.

For me, the real measure of success is straightforward: Can we introduce a new site or deploy an existing use case without redesigning the entire integration and information model?

If every rollout requires another round of custom definitions and application-specific transformations, the standardisation effort has not yet delivered its intended benefit.

Standardise the meaning of information, its interfaces and the rules for maintaining it. Standardise the underlying systems where there is a clear operational or economic reason to do so.

That approach creates a foundation for scalable industrial digitalisation without turning every factory into an expensive system migration project.

Frequently Asked Questions

Do All Manufacturing Plants Need the Same MES to Standardise Production Data?

No. Different MES applications can provide comparable production information if the organisation establishes common definitions, information contracts and appropriate source mappings. A shared MES may simplify certain operations, but it is not a prerequisite for standardised manufacturing data.

What Is the Difference Between Data Standardisation and System Standardisation?

Data standardisation establishes common meanings, structures, identifiers and quality requirements for information. System standardisation focuses on using common software, platforms or technologies. Both can create value, but identical systems do not automatically guarantee consistent information.

Can a Unified Namespace Standardise Manufacturing Data Across Multiple Sites?

A Unified Namespace can provide a shared architecture for making industrial information accessible across systems and sites. However, MQTT topics and common naming conventions alone do not guarantee semantic interoperability. Shared information models, definitions, identifiers and governance are also necessary.

Which Standards Support Multi-Site Manufacturing Data Integration?

ISA-95 / IEC 62264, OPC UA Companion Specifications, MQTT with Sparkplug and the Asset Administration Shell can support different aspects of integration and interoperability. They provide useful building blocks, but organisations must still define their business-specific information contracts and operating requirements.

How Should Manufacturers Start Standardising Data Across Plants?

Start with a limited number of cross-site use cases and define the information required to support them. Establish common definitions and contracts, validate them across at least two different production environments, and separate reusable components from site-specific mappings before expanding the rollout.

Who Should Maintain Shared Manufacturing Information Models?

Shared information models require clear business and technical ownership. Central functions should govern common definitions, schemas and compatibility rules, while local production and engineering teams validate source mappings and process-specific requirements. Changes affecting multiple sites or applications need a controlled approval and versioning process.

Build Scalable Manufacturing Data Architecture

Creating consistent production information across multiple plants requires more than connecting machines or selecting a common software platform. It requires an understanding of production processes, existing system landscapes, semantic information models and the economic implications of different architectural choices.

IT/OT Experts supports manufacturing organisations in defining scalable industrial data architectures, integrating existing IT and OT systems and establishing information models that can be reused across production sites.

From assessing heterogeneous brownfield environments and developing integration strategies to designing Unified Namespace architectures, implementing industrial data solutions and defining the responsibilities required for long-term operation.

The objective is to enable cross-site use cases without creating unnecessary technological dependencies or replacing systems that already fulfil their purpose.

About the Author

Martin Waßmann is the founder of IT/OT Experts and supports manufacturing companies with digital strategy, IT/OT integration and scalable production data architectures.

His focus includes Brownfield integration, Unified Namespace, MQTT and OPC UA.